3D view unavailable
Your browser or device doesn't support WebGL. The takeoff and exports still work — use the controls.
Line segments
Segment parameters
Construction method (plant, crews, productivity)
Plant and crew defaults are indicative and flow through the programme, render, BOQ and Tx1 bridge.
Free issue (principal supplies?)
Tick what the principal (network owner) supplies free-issue. Anything unticked is contractor-supplied and priced. The big four default to principal-supplied.
Project & sign-off (for the report)
Line takeoff
—Two layers: the market all-in benchmark ($/route-km × terrain, AACE Class 5 −30/+50%, AUD ex-GST 2025 — includes owner's cost, design, P&G, margin & contingency) and the bottom-up construction direct build-up (split contractor vs principal free-issue material). The build-up is normally a fraction of the all-in. INDICATIVE — not a tendered price; finals set in Tx1.
—
—
⚠ Indicative planning takeoff only — representative structure/conductor/foundation bands. Replace every quantity with the principal's tower schedule, conductor spec, the free-issue schedule and RPEQ/geotech foundation design before tender or construction (AS/NZS 7000 · AS 3995).